← Mission archive
Beresheet

Image: TaBaZzz · CC BY-SA 4.0 · Wikimedia Commons

Planetary science

Beresheet

Failed

SpaceIL

Image: TaBaZzz · CC BY-SA 4.0 · Wikimedia Commons

Launched
22 Feb 201901:45:00 UTC
Last contact
11 Apr 201919:23:00 UTC
End declared
11 Apr 2019
Duration
1 month 20 days
Destinations
Moon

The first privately funded mission to attempt a Moon landing, built by the Israeli non-profit SpaceIL with Israel Aerospace Industries. A main-engine failure during descent caused it to crash.

Milestones

Swipe the timeline to see it all, and tap an event to open it.

Spacecraft

Beresheet

Lander
Failed

Compact four-legged lander that carried a magnetometer and a NASA laser retroreflector.

Launch mass
585 kg
Dry mass
150 kg
Size
1.5 m × 2 m, span 2.3 m
Power
Solar
Last contact
11 Apr 2019, 19:23:00 UTC
End declared
11 Apr 2019
Designator
2019-009B

Mission details from nssdc.gsfc.nasa.gov.